ZPD26-0008: 155-ft cell tower near 6101 Highway 377, south of Canyon Falls Drive
Near 6101 Highway 377, Flower Mound · Planning & Zoning Commission hearing held Mon Oct 12
What's proposed
Rezone to Planned Development District No. 213 (PD-213), keeping Agricultural uses, so SBA Communications can build a 150-ft monopole with a 5-ft lightning rod (155 ft overall). The coverage maps in the packet are Verizon's, citing 911 coverage and 5G capacity toward Northlake, Corral City and Argyle. A 15 × 166 ft gravel equipment compound would sit behind an 8-ft decorative masonry wall made to match the adjoining residential community sign wall, reached by a 12-ft gravel drive. The tower color would be a neutral, non-reflective finish the town picks. A tower needs only a Specific Use Permit in this district; it needs a PD here because the applicant asks for exceptions to the town's 13 tower standards.
Staff recommendation
Not published. The staff analysis walks through each tower standard and the requested changes but doesn't recommend approval or denial in the agenda text.
Who it helps or hurts
A 155-ft tower is visible over a wide area; the packet's photo survey shoots it from Canyon Falls Drive about 0.1 mile away. The tower would stand 4 ft from the nearest property line instead of the code's setbacks, and landscaping outside the wall is waived.
Better Verizon coverage and capacity along the US 377 corridor, with no traffic: the site is unmanned and visited only for maintenance.
Within about 1,000 feet
The town has not published a notice radius or count in the agenda text. The zoning and aerial map is attached to the agenda item.
Watch for
- The setback. Town code wants the tower at least 20% of its height (31 ft) from every property line and 50 ft from lines next to a residential district; staff reports a request for 4 ft (the applicant's letter says 0 ft).
- Other waivers: no landscaping outside the wall, no 50-ft separation from other structures on the railroad land, and tree survey and mitigation limited to trees the work directly touches.
- Code requires showing that existing towers in the service area can't carry this equipment. The applicant's answer is that this monopole is "necessary to satisfy the network objectives"; ask whether colocation was checked.
- The commission also elects officers that night, so the item sits after other business.
Next step
The commission makes a recommendation; the Town Council takes final action. A Council date is not published.
Source
Town of Flower Mound P&Z agenda item J.1, staff analysis and Planned Development package (source PDF)
Only the cases near you, every week, across DFW. $40/month.